The EuroFlo Industrial Pump system retains Tunnel boring machine (TBM) cool by a steady water provide. The Cross Rail challenge is an east-west rail route that passes under the town of London utilizing new twin-bore 21km tunnels.
EuroFlo pumps and the tanks are positioned at the surface; the water is pumped from there all the method down to the shaft and all alongside the tunnel up to the TBM. Once เกจวัดแรงดันน้ำ has passed through the TBM system the remaining water comes back through a filtration system to the tanks on the surface, out of the tunnel.
The water circuit offers 20 l/s to each TBM and 8 l/s is used within the TBM for various works and 12 l/s returns to the tanks. เพรสเชอร์เกจน้ำ needed ranges between 4 and 10 bar. On one site three TBM’s are operating and the pump system delivers 60 l/s, with the tools consisting of one single tank (3200m3) and one industrial pump used per tunnel. On another site, the set up support’s the excavation with only one TBM with 20 litres/second and the water storage tank capacity of 1100m3
EuroFlo use 37 kW vertical multistage Industrial pumps for the cooling system whereas the TBM excavates by way of a significant underground part of the Cross rail venture.
Share

Leave a Reply